The Dominican Government begins works for the tourist transformation of Boca Chica, a town located 30 km from the capital of the country, Santo Domingo, highlighted by its beach Playa Boca Chica, known for its turquoise waters, white sand and family - friendly atmosphere, protected by a coral reef, acting as a natural barrier and creating a large, natural swimming pool ideal for swimming and wading facing a shallow bay where the mangrove - covered islet La Matica, a renowned habitat for various species of birds.
The initiative aims to revitalise the town into a premier tourist, economic, and logistical hub and will tackle historical infrastructure, environmental, and urbanization challenges.
These interventions are part of the plans of the Ministry of Tourism (Mitur) to turn Boca Chica into a more sustainable and inclusive tourist destination and the Minister of Tourism, David Collado, began the construction work of three important works in the municiopality, which include the Andrés boardwalk, a square, and a park with an investment of RD$ 414.494.110. The official stated that these works will mark a before and after for the town.
Tourism and Public Space Revitalization for the Tourist Transformation of Boca Chica - Details:
Malecón de Andrés: Ground has officially been broken on the construction of the new Andrés waterfront, that will be executed in an intervention of approximately 53.806 square metres, from Brisas del Caucedo Street to end of the beach area.
The reconstruction of the waterfront, include recreational areas, access roads and a road section of approximately 923 linear metres of the Puerto Caucedo highway, with the aim of reducing heavy traffic and improving mobility in the area.
The works will include preliminary cleaning work, preparation of the land and technical studies; rehabilitation of the boardwalk, sidewaks, pavements, storm drainage and road signage.
In addition, construction will include sales modules, bathrooms, gazebo, security checkpoint and recreational spaces such as beach volleyball court, children’s games and exercise areas.
Similarly the project, which will have an investment of RD$ 380.738.684 includes the reorganization of parking areas, the installation of street furniture, lighting, landscaping, as well as sanitary and electrical systems, including public lighting and internal networks, with the purpose of improving the conditions of use, safety and attractiveness of the space for residents and visitors.
Plaza Caracoles: The remodelling of the square Plaza Caracoles, a project bounded by Duarte Avenue and south of Boca Chica beach, will be executed in an intervention area of 1.495 square metres of green area, 575 of pavement and 700 of natural sand path.
At the cost of RD$ 16.745.425, the project includes the construction of a new square, landscaping, lighting, installation of urban furniture including trash cans, bollards, benches, restoration of swings, reconstruction of sidewalks and signage.
Parque Central: The reconstruction of Parque Central (Central Park), bounded by San Rafael Arcángel Avenue to the north, Duarte Avenue to the south, Pedro Mella Street to the wast and Juan B. Vecino Street to the west, includes an intervention area of 1.472 square metres with 560 M2 of green area, 765 M2 of pavement and 50 M2 of access ramps for the disabled,The investment of this work will cost RD$ 17.010.000.
The set of these projects come in addition to the comprehensive plan for the reorganization of Boca Chica, which includes the remodelling of San Rafael Arcángel Parish, the reconstruction of Children’s Park, a Politur building, a vendor’s plaza, Duarte Street and intervention of the beach, among others.
Link
No comments:
Post a Comment
Thanks a lot to read and note.